基于强化学习与知识图谱的大型装备维保资源调度优化

Optimization of Large Equipment Maintenance Resource Scheduling based on Reinforcement Learning and Knowledge Graph

  • 摘要: 大型装备维保资源调度面临任务动态性强、约束条件复杂、知识依赖度高等挑战,传统调度方法难以实现多目标实时优化。本文提出一种融合知识图谱与强化学习的智能调度优化方法。首先构建大型装备维保领域知识图谱,结构化存储装备故障模式、维保工艺、资源约束及历史调度案例,形成调度决策的先验知识库。在此基础上,设计基于深度Q网络(DQN)的强化学习调度模型,将维保任务、资源状态与知识图谱嵌入特征共同作为状态空间,以最小化维保完成时间、资源负载均衡度和紧急任务响应延迟为多目标奖励函数。通过在典型大型装备维保场景中进行仿真训练与测试,结果表明:该方法较传统启发式算法和单一强化学习方法,平均调度周期缩短18.6%,资源利用率提升12.3%。知识图谱的引入有效缓解了强化学习在稀疏奖励下的探索困难,提升了调度策略的泛化能力。本文为大型装备维保资源的智能化调度提供了新思路。

     

    Abstract: The scheduling of maintenance resources for large-scale equipment faces challenges such as strong task dynamics, complex constraint conditions, and high knowledge dependence. Traditional scheduling methods are difficult to achieve multi-objective real-time optimization. This article proposes an intelligent scheduling optimization method that integrates knowledge graph and reinforcement learning. Firstly, construct a knowledge graph in the field of large-scale equipment maintenance, structurally store equipment failure modes, maintenance processes, resource constraints, and historical scheduling cases, and form a prior knowledge base for scheduling decisions. On this basis, a reinforcement learning scheduling model based on Deep Q-Network (DQN) is designed, which combines maintenance tasks, resource states, and knowledge graph embedding features as a state space to minimize maintenance completion time, resource load balancing, and emergency task response delay as multi-objective reward functions. Through simulation training and testing in typical large-scale equipment maintenance scenarios, the results show that this method reduces the average scheduling cycle by 18.6% and improves resource utilization by 12.3% compared to traditional heuristic algorithms and single reinforcement learning methods. The introduction of knowledge graphs effectively alleviates the exploration difficulty of reinforcement learning under sparse rewards and improves the generalization ability of scheduling strategies. This article provides a new idea for intelligent scheduling of maintenance resources for large-scale equipment.

     

/

返回文章
返回